Portal de Calasparra

www.portaldecalasparra.com

Calasparra - SpanishCalasparra - English
detail of Calasparra

 

CHS river conditions the Argos in Calasparra (26/01/2010)

The Segura basin (CHS) has invested 481,928.66 in preparation for Argos river passing through the town of Calasparra.

The president of the CHS, José Salvador Fuentes Zorita, and the mayor of Calasparra, Jesus Navarro, today visited the work already completed this action is framed by the State Special Fund for Promoting the Economy and Employment, integrated with with the Local Investment Fund, the Plan E.

The stretch conditioning has nearly 2.5 kilometers long and 27,600 meters of extension.

Specifically, it is bounded by the Puente de Hierro and the place de la Cuesta Blanca, inclusive.

The work has not only restore an area degraded by human impact, but also recover for the responsible use and enjoyment of citizens.

Agricultural development in the region of Argos in Calasparra river had been a change in the balance and the natural ecological conditions of the river and its environment.

Among the most important manifestations of this process was the decline of river ecosystems associated with the river, a situation that led to the deterioration of the Public Water (DPH).

For this reason, the CHS began operation works with a pre-cleaning and general preparation of the ground, involving the removal of debris and garbage removal and road that ran by the DPH.

Immediately after, he made a series of river trails to tour the river, combining the construction of new roads with existing selective recovery.

In addition, improved vegetation cover by planting native trees and shrubs, removing part of the reeds and the reeds.

Finally, two playgrounds have been built located in the Iron Bridge and the Cuesta Blanca.

These areas have the adequate provision of furniture, barriers and easy access by car or on foot.

This work is part of a larger project called "Improving the ecological condition of rivers and watercourses Segura Basin", funded by the Plan E 4,999,734.20 euros.

Source: CHS

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información